Evidence Hub

Actinobacillus ureae may be a critical pathogen in patients with predispositions: A case report and review of the literature

Yang Q, Zhong Q, Wu B, Xu X, Li W, Zhao B, Luo M, Zhu X et al.

Medicine, 2023

2 citations

Abstract

Rationale: Actinobacillus ureae (A. ureae) is an unusual commensal of human respiratory flora, rarely causing human infection. The predisposing factors, identification, clinical features, and antibiotic therapy of A. ureae are seldomly reported. Herein, we present a case of 64-year-old man affected by A. ureae pneumonia after intracranial surgery.

Patient concerns and diagnoses: A 64-year-old male was admitted with vomiting, drowsiness, and a severe disturbance of consciousness and was later diagnosed with cerebral hemorrhage by computed tomography images. After a craniocerebral surgery, the patient suffered from intractable pneumonia, experiencing treatment failure with multiple anti-bacterial agents. Sputum culture yield pure colonies of A. ureae, confirmed by matrix-assisted laser desorption/ionization time of flight and 16S rRNA gene sequencing.

Interventions: Minocycline (100 mg p.o. per 12 hours) with a course of 15 days was administrated for this patient.

Outcomes: The respiratory symptoms, presenting as intermittent coughing with purulent and yellowish sputum, were gone. A 3-month follow-up examination showed a complete resolution of radiological findings.

Lessons: Clinically, the actual incidence of A. ureae pneumonia may be higher than that we generally recognized, and clinicians should consider A. ureae as a possible etiologic agent in patients with predispositions. Currently, A. ureae may be susceptible to penicillin, ampicillin, and third-generation…

How strong is the evidence?

Evidence Hub reads this as a case report, done in people. Its evidence level is 5 of 5 (Very low · case / narrative / animal / in vitro / in silico). Case reports, narrative reviews, and animal, cell or computer-model studies give the weakest evidence for human health.

How the five levels of evidence work. The level is assigned automatically from the abstract and can be wrong, so check the paper.

Read the paper

Related studies

Go deeper in Evidence Hub

Evidence Hub adds a study data sheet (design, sample size, evidence level, key numbers), an AI summary and a chat grounded in the paper's text.

Open this study Sign up free